• Engineered Hardwood
  • Flexible Vinyl
  • Laminate
  • Rigid Vinyl
DIY install engineered hardwood flooring video
videoPlayIcon

Learn how to DIY install engineered hardwood flooring.

For detailed instructions, please select your product:

PureTech select logo
Installation Guide

PureTech uses Uniclic®, a revolutionary system for installing flooring without the hassle of glue. The planks can be clicked together for a quick and simple installation.

Hard Surface Installation FAQ’s

Yes, Mohawk Engineered & Longstrip (glueless) Hardwood Floors are suitable for installing over a radiant heated concrete slab. Caution: The slab surface must never exceed 85 degrees F in temperature. Before installing over a radiant heated floor, turn off heat and wait until the floor has reached room temperature. After installing the floor return the heat to the previous setting.

Mohawk Engineered & Longstrip (glueless) Hardwood Floors can be installed over most concrete slabs (not solid hardwood). The concrete slab must be fully cured for at least 60 days, free of structural defects, clean and visually dry with no history of moisture problems. When testing for moisture, Mohawk suggests utilizing the industry–standard calcium chloride test or the Tramex Moisture Encounter (5 max). Note: All 3/8” solid products may be glued to a concrete slab using Mohawk’s approved glue and sealant system. Light–weight concrete that has a dry density of 100 pounds or less per cubic foot is not suitable for Mohawk hardwood floors.

If the damaged area is smaller than an inch in diameter you can use ColorFill Putty to repair the defect. If the damaged area is too large replacing the plank may be required. See the Installation Guidelines for additional information and recommendations.

Mohawk Engineered Hardwood Floors may be installed on all grade levels. See the Installation Guidelines for additional information and recommendations.